Skip to content

Daycare center Baden-Baden

Inspiration & Projekte: Daycare center Baden-Baden

At the pergola and on the external staircase, the lattice surfaces take on the function of railing infill, cladding and walkable surface along the access route.

Pressed gratings and solid gratings with a mesh size of 33 x 33 mm and 33 x 11 mm as well as 30 x 2 mm and 35 x 2 mm bearing bars were installed over a total area of 250 m². The uniform grid pattern ensures clear lines on the stairs and gallery and supports a robust design in outdoor areas. This creates functional surfaces for balustrade infills and access zones with a consistent design.

Verbaute Produkte

Unsere Lösungen im Einsatz

Unsere Lösungen im Einsatz – Coating Solutions

Coating Solutions

Piece, strip galvanizing and powder coating for reliable corrosion protection of steel components.

Relaunch meiser.de – Pressed gratings

Pressed gratings

In combination with the different materials from which pressed gratings can be manufactured, gratings are created that are precisely tailored to customer requirements and the intended use.

Relaunch meiser.de – Full grates

Full grates

The full grating bears this name because the bearing and filling bars have the same cross-section and are therefore the same height. The bearing bar is the one that rests on both ends and whose underside is not slotted.

Relaunch meiser.de – Powder coating & wet coating

Powder coating & wet coating

Surface coating for functional and design requirements - as a stand-alone solution or in combination with galvanizing.

Relaunch meiser.de – Coating Solutions

Coating Solutions

Piece, strip galvanizing and powder coating for reliable corrosion protection of steel components.

Found inspiration? Get in touch now!

Passend zum Projekt

Weitere Referenzen

Zu allen Referenzen
MEISER: Plauen municipal swimming pool
MEISER - Plauen municipal swimming pool

Plauen municipal swimming pool

In the Plauen municipal swimming pool, pressed gratings were used as partial elements of the ceiling cladding and characterize the design of the indoor swimming pool.

MEISER: Atlantic Sail City
MEISER - Atlantic Sail City

Atlantic Sail City

At Atlantic Sail City, raised outdoor platforms with walk-on floor coverings were implemented and secured by railings and balustrades.

MEISER: De Walvis Amsterdam
MEISER - De Walvis Amsterdam

De Walvis Amsterdam

In the De Walvis project in Amsterdam, façade and ceiling areas were implemented with lattice elements that characterize the architecture and incorporate the outdoor areas.

MEISER: Porsche Center Lübeck
MEISER - Porsche Center Lübeck

Porsche Center Lübeck

At the Porsche Center Lübeck, narrow grating strips were integrated into the interior as clear lines both in the floor area and as a ceiling solution.

MEISER: Kriechel Winery
MEISER - Kriechel Winery

Kriechel Winery

Robust pile solutions for challenging steep slopes at the Kriechel vineyard in the Ahr valley.

MEISER: Stone slab Waidring
MEISER - Stone slab Waidring

Stone slab Waidring

In the Steinplatte Waidring project, gratings were used as walkable surfaces on a viewing platform on the rock.

MEISER: Frauenhofer IPM
MEISER - Frauenhofer IPM

Frauenhofer IPM

At Fraunhofer IPM, lattice elements in the outdoor area secure a technical system and at the same time support the necessary ventilation.

MEISER: Ingolstadt fire department
MEISER - Ingolstadt fire department

Ingolstadt fire department

Every second counts in an emergency - especially when equipment needs to be ready to hand quickly and reliably. Functional systems in the fire department make a decisive contribution to the efficient organization of processes in an emergency.

MEISER: Lübars solar park
MEISER - Lübars solar park

Lübars solar park

MEISER supplied the substructure for the photovoltaic system for the Lübars solar park in Saxony-Anhalt. The project makes an important contribution to sustainable power generation and land use.

MEISER: Museum Buxtehude
MEISER - Museum Buxtehude

Museum Buxtehude

At the museum in Buxtehude, an external escape and access staircase with accessible steps and landings made of gratings was implemented.

MEISER: Losheim office building
MEISER - Losheim office building

Losheim office building

For the office building in Niederlosheim, a continuous ceiling cladding was realized throughout the entire complex and supplemented by solutions for floor areas and walkways.

MEISER: Office building Cologne
MEISER - Office building Cologne

Office building Cologne

On the office building in Cologne, façade elements were implemented as an upstream grid structure to functionally complement window areas and structure the design.

MEISER: Administration Stahlwerke Bremen
MEISER - Administration Stahlwerke Bremen

Administration Stahlwerke Bremen

Lattice elements were integrated into the glass façade of the Stahlwerke Bremen administration building as visible façade and construction elements.

MEISER: Opera de Vichy
MEISER - Opera de Vichy

Opera de Vichy

At the opera house in Vichy, open terrace areas support safe operation in the entrance area at the square in front.

MEISER: IKEA Vienna
MEISER - IKEA Vienna

IKEA Vienna

In the Ikea Vienna project, external levels and entrances were implemented on the open façade structure over several storeys.

MEISER: Pinacotheca
MEISER - Pinacotheca

Pinacotheca

In the Pinakothek in Munich, gratings support safe inspection and service work as an accessible maintenance walkway in the roof area.

MEISER: The Cradle
MEISER - The Cradle

The Cradle

In "The Cradle", gratings are used as walkable outdoor surfaces on balconies and arcades along the façade.

MEISER: Eccentric house Bochum
MEISER - Eccentric house Bochum

Eccentric house Bochum

At the Exzenterhaus Bochum, full gratings were used as walk-on surfaces and blend in with the surrounding design of the building envelope.

MEISER: Parking deck Marburg
MEISER - Parking deck Marburg

Parking deck Marburg

On the parking deck in Marburg, ramp areas and railing zones were designed with lattice elements that clearly structure the spiral-shaped construction.

MEISER: Van Volxem Wiltingen
MEISER - Van Volxem Wiltingen

Van Volxem Wiltingen

At Van Volxem in Wiltingen, a flush-fitted grating surface was integrated into the courtyard design as a functional cover.

MEISER: Technology Center Potsdam
MEISER - Technology Center Potsdam

Technology Center Potsdam

At the Potsdam Technology Center, stairs and access areas in the outdoor area were covered with grating for safe paths.

MEISER: Vario Guard Switzerland
MEISER - Vario Guard Switzerland

Vario Guard Switzerland

Our Vario-Guard stands for reliable protection and flexible use in a wide range of applications. MEISER also contributes to the implementation of sophisticated protection systems in international projects with high-quality components.

MEISER: Imma-Mack-Realschule Eching
MEISER - Imma-Mack-Realschule Eching

Imma-Mack-Realschule Eching

At the Imma-Mack secondary school in Eching, open façade and ceiling surfaces divide the interior and exterior areas with a permeable structure.

MEISER: BVG Berlin
MEISER - BVG Berlin

BVG Berlin

At the BVG in Berlin, gratings are used as accessible walking and maintenance surfaces in a technical plant area.

MEISER: Adorf observation tower
MEISER - Adorf observation tower

Adorf observation tower

At the Adorf observation tower, staircases and platforms were implemented over several levels with accessible grating surfaces and secured landings.

MEISER: BMW parking garage Paris Velizy
MEISER - BMW parking garage Paris Velizy

BMW parking garage Paris Velizy

In the BMW parking garage Paris Vélizy, a circumferential MEISER grating façade forms the permeable outer skin of the parking levels.

MEISER: Gammertingen solar park
MEISER - Gammertingen solar park

Gammertingen solar park

MEISER supplied the substructure for the photovoltaic system for the Gammertingen solar park in Baden-Württemberg. The project combines solar energy and battery storage for sustainable power generation.

MEISER: Double carport
MEISER - Double carport

Double carport

Reliable technology shows its strength especially in daily use. Durable, functional solutions that combine comfort and stability are crucial.

MEISER: Zollverein World Heritage Site
MEISER - Zollverein World Heritage Site

Zollverein World Heritage Site

At the Zollverein World Heritage Site, lattice elements were used as railing infills to safely enclose openings and entrances in the hall area.

MEISER: Munich Airport
MEISER - Munich Airport

Munich Airport

Reliability and precision are crucial when it comes to a secure connection between the terminal and the aircraft. Sliding hardware plays a key role here: it enables controlled movement sequences and ensures smooth operation - even under heavy daily use.

MEISER: Vario-Guard MUF on the E40 near Borås, Sweden
MEISER - Vario-Guard MUF on the E40 near Borås, Sweden

Vario-Guard MUF on the E40 near Borås, Sweden

MEISER supplied Vario-Guard MUF systems including specially developed transition solutions for the widening of the E40 near Borås in Sweden. The project was implemented in collaboration with the construction company PEAB.

MEISER: Denios AG Bad Oeynhausen
MEISER - Denios AG Bad Oeynhausen

Denios AG Bad Oeynhausen

At Denios AG in Bad Oeynhausen, open walkways and shelving areas support safe operation in modular container systems.

MEISER: Hegau Tower Hotel
MEISER - Hegau Tower Hotel

Hegau Tower Hotel

In the Hegau Tower Hotel, pressed gratings were used as walk-on flooring in the maintenance area on the roof.

MEISER: Elbphilarmonie Hamburg
MEISER - Elbphilarmonie Hamburg

Elbphilarmonie Hamburg

At the Elbphilharmonie concert hall in Hamburg, open maintenance areas create clear walking zones in the roof area around the technical equipment.

MEISER: Zalazone Test Site
MEISER - Zalazone Test Site

Zalazone Test Site

MEISER supplied the vehicle restraint systems to secure various test modules for the AVL ZalaZONE test track in Hungary. The project is one of the most modern development and testing centers for vehicle and mobility technologies in Europe.

MEISER: Yarn rider stable
MEISER - Yarn rider stable

Yarn rider stable

At Gestüt Garnreiter, the focus is on safety, peace and quiet and functionality in everyday stable life. Sophisticated technical solutions are used to reliably support the daily handling of the horses.

MEISER: Garden Curtain Wall
MEISER - Garden Curtain Wall

Garden Curtain Wall

The façade of the Garden Curtain Wall is clad with expanded metal with a medium mesh width, giving the building a modern, light look.

MEISER: Letschin solar park
MEISER - Letschin solar park

Letschin solar park

MEISER supplied the substructure for the photovoltaic system for the Letschin solar park in Brandenburg. The project is one of the largest solar park projects in Energiekontor's history.

MEISER: Art Deco Aviation
MEISER - Art Deco Aviation

Art Deco Aviation

At Art Deko Aviation, large, resilient floor surfaces for the operation and handling of aircraft were implemented in an aircraft hangar.

MEISER: National Library of Luxembourg
MEISER - National Library of Luxembourg

National Library of Luxembourg

In the National Library in Luxembourg, solid gratings were used as partial elements of the ceiling cladding to give the interior a clear structure.

MEISER: European School Rövershagen
MEISER - European School Rövershagen

European School Rövershagen

At the Europaschule Rövershagen, external stairs and paths as well as areas around the building were designed with permanently safe, accessible surfaces.

MEISER: Observation tower Gobelwarte Grein
MEISER - Observation tower Gobelwarte Grein

Observation tower Gobelwarte Grein

At the Gobelwarte observation tower in Grein, the platform and staircase were fitted with grating coverings for safe, accessible surfaces in the steel structure.

MEISER: Tiger & Turtle
MEISER - Tiger & Turtle

Tiger & Turtle

At Tiger & Turtle, MEISER gratings make the curved circular path with steps a safe area for visitors to walk on.

MEISER: German Hygiene Museum
MEISER - German Hygiene Museum

German Hygiene Museum

In the Deutsches Hygiene-Museum, grid elements were integrated as permeable ceiling cladding above the stage and structure the event hall.

MEISER: Hanse House Oberleichtersbach
MEISER - Hanse House Oberleichtersbach

Hanse House Oberleichtersbach

At Hanse-Haus in Oberleichtersbach, gratings are used as accessible walking, working and maintenance surfaces in the hall and production area.

MEISER: Heinsfeld Castle Museum
MEISER - Heinsfeld Castle Museum

Heinsfeld Castle Museum

At Heinsfeld Castle Museum, full gratings were integrated into the historic wall situation as walk-on flooring in front of the arched openings.

MEISER: Stralsund Oceanarium
MEISER - Stralsund Oceanarium

Stralsund Oceanarium

In the Ozeaneum Stralsund, pressed gratings were used as railing fillings to clearly define the ramp layout in the interior.

MEISER: Treetop Walk Steigerwald Ebrach
MEISER - Treetop Walk Steigerwald Ebrach

Treetop Walk Steigerwald Ebrach

At the Steigerwald treetop walk in Ebrach, gratings act as walk-on viewing windows to complement the path and recreation area and provide a view downwards.

MEISER: Ammersee-Gymnasium Dießen
MEISER - Ammersee-Gymnasium Dießen

Ammersee-Gymnasium Dießen

At Ammersee-Gymnasium in Dießen, outdoor areas and steel construction elements were finished with grating to give paths and façade areas a clear structure.

MEISER: Grindelwald First
MEISER - Grindelwald First

Grindelwald First

For the "First View" viewing platform on Grindelwald First, load-bearing and accessible surfaces were integrated into the striking steel structure at an altitude of around 2,200 meters.

Let's talk about whatyou have in mind,

Let's talk about whatyou have in mind,

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.