Skip to content

National Library of Luxembourg

Inspiration & Projekte: National Library of Luxembourg

In the open library space, the large ceiling with geometric light fields characterizes the effect of the interior design.

Gratings were installed in the full grating version made of aluminum, powder-coated to RAL 9010, used as partial elements of the ceiling cladding. The design covers approx. 390 m² and blends into the ceiling structure of the building. The result is a clean, permanently usable solution for the interior design.

Verbaute Produkte

Unsere Lösungen im Einsatz

Unsere Lösungen im Einsatz – Coating Solutions

Coating Solutions

Piece, strip galvanizing and powder coating for reliable corrosion protection of steel components.

Relaunch meiser.de – Gratings

Gratings

Gratings are used as robust platform and walkway coverings in heavy industry, architecture, plant construction and logistics.

Relaunch meiser.de – Full grates

Full grates

The full grating bears this name because the bearing and filling bars have the same cross-section and are therefore the same height. The bearing bar is the one that rests on both ends and whose underside is not slotted.

Relaunch meiser.de – Powder coating

Powder coating

Powder coating offers a high-quality surface finish with long-lasting protection and an attractive appearance. It is suitable for steel and metal components where the focus is on corrosion protection, resistance and color quality.

Relaunch meiser.de – Coating Solutions

Coating Solutions

Piece, strip galvanizing and powder coating for reliable corrosion protection of steel components.

Found inspiration? Get in touch now!

Passend zum Projekt

Weitere Referenzen

Zu allen Referenzen
MEISER: Opera de Vichy
MEISER - Opera de Vichy

Opera de Vichy

At the opera house in Vichy, open terrace areas support safe operation in the entrance area at the square in front.

MEISER: Plauen municipal swimming pool
MEISER - Plauen municipal swimming pool

Plauen municipal swimming pool

In the Plauen municipal swimming pool, pressed gratings were used as partial elements of the ceiling cladding and characterize the design of the indoor swimming pool.

MEISER: Egyptian Museum Munich
MEISER - Egyptian Museum Munich

Egyptian Museum Munich

In the Egyptian Museum in Munich, grid elements were integrated into the ceiling as linear bands and structure the space along the access route.

MEISER: Losheim office building
MEISER - Losheim office building

Losheim office building

For the office building in Niederlosheim, a continuous ceiling cladding was realized throughout the entire complex and supplemented by solutions for floor areas and walkways.

MEISER: Silicon Products Group
MEISER - Silicon Products Group

Silicon Products Group

At Silicon Products Group, maintenance platforms and walkways in the industrial plant were equipped with walk-on grating surfaces.

MEISER: Elbphilarmonie Hamburg
MEISER - Elbphilarmonie Hamburg

Elbphilarmonie Hamburg

At the Elbphilharmonie concert hall in Hamburg, open maintenance areas create clear walking zones in the roof area around the technical equipment.

MEISER: Technology Center Potsdam
MEISER - Technology Center Potsdam

Technology Center Potsdam

At the Potsdam Technology Center, stairs and access areas in the outdoor area were covered with grating for safe paths.

MEISER: Denios AG Bad Oeynhausen
MEISER - Denios AG Bad Oeynhausen

Denios AG Bad Oeynhausen

At Denios AG in Bad Oeynhausen, open walkways and shelving areas support safe operation in modular container systems.

MEISER: Stone slab Waidring
MEISER - Stone slab Waidring

Stone slab Waidring

In the Steinplatte Waidring project, gratings were used as walkable surfaces on a viewing platform on the rock.

MEISER: Stralsund Oceanarium
MEISER - Stralsund Oceanarium

Stralsund Oceanarium

In the Ozeaneum Stralsund, pressed gratings were used as railing fillings to clearly define the ramp layout in the interior.

MEISER: Tiger & Turtle
MEISER - Tiger & Turtle

Tiger & Turtle

At Tiger & Turtle, MEISER gratings make the curved circular path with steps a safe area for visitors to walk on.

MEISER: BMW parking garage Paris Velizy
MEISER - BMW parking garage Paris Velizy

BMW parking garage Paris Velizy

In the BMW parking garage Paris Vélizy, a circumferential MEISER grating façade forms the permeable outer skin of the parking levels.

MEISER: Hegau Tower Hotel
MEISER - Hegau Tower Hotel

Hegau Tower Hotel

In the Hegau Tower Hotel, pressed gratings were used as walk-on flooring in the maintenance area on the roof.

MEISER: Atlantic Sail City
MEISER - Atlantic Sail City

Atlantic Sail City

At Atlantic Sail City, raised outdoor platforms with walk-on floor coverings were implemented and secured by railings and balustrades.

MEISER: Porsche Center Lübeck
MEISER - Porsche Center Lübeck

Porsche Center Lübeck

At the Porsche Center Lübeck, narrow grating strips were integrated into the interior as clear lines both in the floor area and as a ceiling solution.

MEISER: Parking garage Bietigheim-Bissingen
MEISER - Parking garage Bietigheim-Bissingen

Parking garage Bietigheim-Bissingen

The access core of the parking garage in Bietigheim-Bissingen was designed with a permeable grid cladding that clearly accentuates the façade.

MEISER: Workshop Saarbahn GmbH Saarbrücken
MEISER - Workshop Saarbahn GmbH Saarbrücken

Workshop Saarbahn GmbH Saarbrücken

In the workshop hall of Saarbahn GmbH in Saarbrücken, accessible walking and working platforms with grating coverings were installed along the maintenance tracks.

MEISER: Observation tower Gobelwarte Grein
MEISER - Observation tower Gobelwarte Grein

Observation tower Gobelwarte Grein

At the Gobelwarte observation tower in Grein, the platform and staircase were fitted with grating coverings for safe, accessible surfaces in the steel structure.

MEISER: Rügen Bridge Stralsund
MEISER - Rügen Bridge Stralsund

Rügen Bridge Stralsund

In the Rügen Bridge in Stralsund, a continuous maintenance walkway was implemented in the interior of the structure with accessible grating surfaces.

MEISER: Treetop Walk Steigerwald Ebrach
MEISER - Treetop Walk Steigerwald Ebrach

Treetop Walk Steigerwald Ebrach

At the Steigerwald treetop walk in Ebrach, gratings act as walk-on viewing windows to complement the path and recreation area and provide a view downwards.

MEISER: Eccentric house Bochum
MEISER - Eccentric house Bochum

Eccentric house Bochum

At the Exzenterhaus Bochum, full gratings were used as walk-on surfaces and blend in with the surrounding design of the building envelope.

MEISER: Ammersee-Gymnasium Dießen
MEISER - Ammersee-Gymnasium Dießen

Ammersee-Gymnasium Dießen

At Ammersee-Gymnasium in Dießen, outdoor areas and steel construction elements were finished with grating to give paths and façade areas a clear structure.

MEISER: Imma-Mack-Realschule Eching
MEISER - Imma-Mack-Realschule Eching

Imma-Mack-Realschule Eching

At the Imma-Mack secondary school in Eching, open façade and ceiling surfaces divide the interior and exterior areas with a permeable structure.

MEISER: Frauenhofer IPM
MEISER - Frauenhofer IPM

Frauenhofer IPM

At Fraunhofer IPM, lattice elements in the outdoor area secure a technical system and at the same time support the necessary ventilation.

MEISER: Heinsfeld Castle Museum
MEISER - Heinsfeld Castle Museum

Heinsfeld Castle Museum

At Heinsfeld Castle Museum, full gratings were integrated into the historic wall situation as walk-on flooring in front of the arched openings.

MEISER: Freiham geothermal power plant
MEISER - Freiham geothermal power plant

Freiham geothermal power plant

At the geothermal power plant in Freiham, maintenance and operating platforms in the technical area were equipped with walk-on grating surfaces.

MEISER: Pedestrian zone Kaufbeuren
MEISER - Pedestrian zone Kaufbeuren

Pedestrian zone Kaufbeuren

In the Kaufbeuren pedestrian zone, a grating was integrated into a seating and recreation area as a flush cover and drainage surface.

MEISER: Van Volxem Wiltingen
MEISER - Van Volxem Wiltingen

Van Volxem Wiltingen

At Van Volxem in Wiltingen, a flush-fitted grating surface was integrated into the courtyard design as a functional cover.

MEISER: Parking garage St. Josef Regensburg
MEISER - Parking garage St. Josef Regensburg

Parking garage St. Josef Regensburg

In the St. Josef Regensburg multi-storey parking lot, VP louvre grilles characterize the building envelope as façade cladding and enclose the open parking levels.

MEISER: Office building Horw
MEISER - Office building Horw

Office building Horw

VP Venetian blind grilles were integrated into the façade design of the office building in Horw as upstream parapet and sun protection elements.

MEISER: Administration Stahlwerke Bremen
MEISER - Administration Stahlwerke Bremen

Administration Stahlwerke Bremen

Lattice elements were integrated into the glass façade of the Stahlwerke Bremen administration building as visible façade and construction elements.

MEISER: Grindelwald First
MEISER - Grindelwald First

Grindelwald First

For the "First View" viewing platform on Grindelwald First, load-bearing and accessible surfaces were integrated into the striking steel structure at an altitude of around 2,200 meters.

MEISER: Moritzburg Art Museum
MEISER - Moritzburg Art Museum

Moritzburg Art Museum

In the Moritzburg Art Museum project, a recessed façade area was implemented with lattice elements to clearly accentuate the transition between the old and new buildings.

MEISER: Zollverein World Heritage Site
MEISER - Zollverein World Heritage Site

Zollverein World Heritage Site

At the Zollverein World Heritage Site, lattice elements were used as railing infills to safely enclose openings and entrances in the hall area.

MEISER: Pinacotheca
MEISER - Pinacotheca

Pinacotheca

In the Pinakothek in Munich, gratings support safe inspection and service work as an accessible maintenance walkway in the roof area.

MEISER: Hanse House Oberleichtersbach
MEISER - Hanse House Oberleichtersbach

Hanse House Oberleichtersbach

At Hanse-Haus in Oberleichtersbach, gratings are used as accessible walking, working and maintenance surfaces in the hall and production area.

MEISER: German Hygiene Museum
MEISER - German Hygiene Museum

German Hygiene Museum

In the Deutsches Hygiene-Museum, grid elements were integrated as permeable ceiling cladding above the stage and structure the event hall.

Let's talk about whatyou have in mind,

Let's talk about whatyou have in mind,

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.