The long platform runs parallel to several tracks and remains clearly visible as an open construction with a yellow-marked edge for demarcation.
GRP systems were installed in the GRP constructions version, used for floor coverings and walkways. The permeable surface forms a non-slip work and maintenance zone next to the rails and runs alongside masts and technical superstructures. This creates clear walking and service areas for system operation.