In the reception area, a large wall cladding in a dark finish is arranged on the left, which remains clearly visible as an open construction. Above the counter, a continuous ceiling cladding under the technical ceiling completes the room and frames the ventilation ducts and lighting.
Gratings with a mesh size of 44 x 44 mm and 40 x 2 mm bearing bars were used for wall cladding and ceiling cladding. The result is a functional solution that structures areas and integrates technical areas in an orderly fashion.