For the new construction of a production hall, MEISER supplied the solution for walkways and platforms within the new plant structure.
Welded pressure-locked gratings with a mesh size of 34 x 38 mm and 40 x 2 mm bearing bars were used. This creates resilient, open access areas that safely integrate maintenance and access areas into the hall structure.